beautypg.com
Manuals
Brands
Cisco Manuals
Server
C880 M5
Cisco C880 M5 Manuals
Manuals and User Guides for Cisco C880 M5. We have
3
Cisco C880 M5 manuals available for free PDF download: Service Manual, Installation Manual, Configuration Manual
Cisco C880 M5 Service Manual (174 pages)
Brand:
Cisco
| Category:
Server
| Size: 13.33 MB
Table of Contents
Table of Contents
3
1 Preparations
12
Outline
12
Scope
12
Typical Time Required for Assembling Options
12
Work Assignment
13
Notes
13
Preparing Tools for Installation
14
Tools and Measuring Instruments
14
Configuration and Setting Information
15
Checking Installation Requirements
15
Environmental Requirements
15
Input Power
16
Input Power System
17
Installation Area
18
Setting the FST
19
Request to System Administrator
20
2 Installing System Board
21
Conditions for Installing Components
21
Firmware Version
21
Maximum Installation Amount
21
Conditions Concerning Combined Use of System Board
21
Base Unit State
21
Work Items, Work Assignment, and Work Time
22
Procedure for Installing a System Board
22
Checking the Delivered Items
22
Installing Option
22
Verifying Operation
23
Preparation of Handing over to the System Administrator
26
Handover to the System Administrator
26
14 Installing TPM
27
3 Installing Cpus
27
Conditions for Installing Components
27
Firmware Version
27
Maximum Installation Amount
27
Conditions Concerning Mixing Different Types of CPU
27
Base Unit State
27
Work Items, Work Assignment, and Work Time
28
Procedure for Installing Cpus
28
Checking the Delivered Items
28
Installing Option
28
4 Installing Memory
29
Conditions for Installing Components
29
Firmware Version
29
Number of Mounted Dimms
29
Conditions on Mixing Different Types of DIMM
29
Memory Installing Order
30
Base Unit State
31
Work Items, Work Assignment, and Work Time
32
Procedure for Installing Memory
32
Checking the Delivered Items
32
Installing Option (Existing SB)
32
Verifying Operation
32
Preparation of Handing over to the System Administrator
32
Installing Option (New SB)
34
Verifying Operation
34
Preparation of Handing over to the System Administrator
37
Handover to the System Administrator
38
5 Installing PCI Card
39
Conditions for Installing Components
39
Firmware Version
39
Maximum Installation Amount
39
Conditions Concerning Combined Use of PCI Card
39
Base Unit State
40
Work Items, Work Assignment, and Work Time
40
Procedure for Installing a PCI Card
40
Checking the Delivered Items
40
Installing Option (Slot#2 or Slot#3)
41
Installing PCI Card (Other than Slot#2 and Slot#3)
42
Verifying Operation
43
Preparation of Handing over to the System Administrator
45
Handover to the System Administrator
45
6 Installing Disk Unit for SAS (DU_SAS)
46
Conditions for Installing Components
46
Firmware Version
46
Maximum Installation Amount
46
Conditions Concerning Combined Use of DU_SAS
46
Base Unit State
46
Work Items, Work Assignment, and Work Time
47
Procedure for Installing a DU_SAS
47
Checking the Delivered Items
47
Installing Option
47
Verifying Operation
48
Preparation of Handing over to the System Administrator
50
Handover to the System Administrator
50
7 Installing Internal Hard Disk Drive (HDD) / Internal Solid State Drive (SSD)
51
Conditions for Installing Components
51
Firmware Version
51
Maximum Installation Amount
51
Conditions Concerning Combined Use of HDD / SSD
51
Base Unit State
51
Work Items, Work Assignment, and Work Time
52
Procedure for Installing HDD / SSD
52
Checking the Delivered Items
52
Installing Option (System Power On)
52
Installing Option (System Power Off)
53
Verifying Operation
53
Preparation of Handing over to the System Administrator
55
Handover to the System Administrator
55
8 Installing Disk Unit for Pcie SFF (DU_PCIE)
56
Conditions for Installing Components
56
Firmware Version
56
Maximum Installation Amount
56
Conditions Concerning Combined Use of DU_PCIE
56
Base Unit State
56
Work Items, Work Assignment, and Work Time
57
Procedure for Installing DU_PCIE
57
Checking the Delivered Items
57
Installing Option
57
Verifying Operation
58
Preparation of Handing over to the System Administrator
60
Handover to the System Administrator
60
9 Installing Pcie SSD SFF (SSD SFF)
61
Conditions for Installing Components
61
Firmware Version
61
Maximum Installation Amount
61
Conditions Concerning Combined Use of SSD SFF
61
Base Unit State
61
Work Items, Work Assignment, and Work Time
62
Procedure for Installing SSD SFF
62
Checking the Delivered Items
62
Installing Option
62
Verifying Operation
63
Preparation of Handing over to the System Administrator
65
Handover to the System Administrator
65
10 Installing I/O Unit B (IOUB)
66
Conditions for Installing Components
66
Firmware Version
66
Maximum Installation Amount
66
Conditions Concerning Combined Use of IOUB
66
Base Unit State
66
Work Items, Work Assignment, and Work Time
67
Procedure for Installing IOUB
67
Checking the Delivered Items
67
Installing Option
67
Verifying Operation
68
Preparation of Handing over to the System Administrator
71
Handover to the System Administrator
71
11 Installing Power Supply Unit (PSU)
72
Conditions for Installing Components
72
Firmware Version
72
Maximum Installation Amount
72
Conditions Concerning Mixing Different Types of PSU
72
Base Unit State
72
Work Items, Work Assignment, and Work Time
73
Procedure for Installing PSU
73
Checking the Delivered Items
73
Installing PSU
73
Setup
74
Verifying Operation
75
Verifying Operation (System Power On)
75
Verifying Operation (System Power Off)
76
Preparation of Handing over to the System Administrator
78
Handover to the System Administrator
78
12 Installing M.2 Flash Device
79
Conditions for Installing Components
79
Firmware Version
79
Maximum Installation Amount
79
Conditions Concerning Combined Use of M2.Flash Device
79
Base Unit State
79
Work Items, Work Assignment, and Work Time
80
Procedure for Installing M.2 Flash Device
80
Checking the Delivered Items
80
Installing Option
80
Verifying Operation
81
Preparation of Handing over to the System Administrator
83
Handover to the System Administrator
83
13 Installing Elcm Activation License
84
Conditions for Installing Components
84
Firmware Version
84
Maximum Installation Amount
84
Conditions Concerning Combined Use of Micro SD
84
Base Unit State
84
Work Items, Work Assignment, and Work Time
85
Procedure for Installing a Micro SD
85
Checking the Delivered Items
85
Verifying Operation
86
Handover to the System Administrator
88
Work Items, Work Assignment, and Work Time
90
Verifying Operation
91
Handover to the System Administrator
93
Appendix A Installation Instructions Sheet
95
Appendix B Customer's Distribution Panel Breaker Requirements
96
Appendix C Plug Types
98
Appendix D Input Power Systems
99
Appendix E Various Operations
103
E.1.4 When Use the Operation Terminal of Customer Equipment Connected to the Network
104
E.2.2 Logout
106
E.3 Video Redirection
107
E.3.2 Video Redirection End
109
E.4 Boot Device Selector Setting
110
E.5 Power On/Off
111
E.5.2 Power off
113
E.6 Memory Operation Mode Setting
114
E.7 Checking Memory Type
115
E.8 SEL Downloading
116
E.9 Power Restore Policy Setting
117
E.10 FBU (BBU) Status Confirming
118
Appendix F Handling the Units
120
F.2.1 Installing SB
121
F.2.2 Removing SB
122
F.2.4 Removing a Cover of SB
123
F.3 Ioub
124
F.3.2 Removing IOUB
125
F.3.4 Removing IOUB Cover
126
F.4 Du_Sas
127
F.5 Du_Pcie
128
F.6.1 Installing PSU
129
F.7.1 Installing CPU
130
F.8 Memory
136
F.8.2 Removing Memory
138
F.9 PCI Card
139
F.9.2 Removing PCI Card (Other than Slot#2 and Slot #3)
140
F.9.3 Installing PCI Card (Slot#2 and Slot#3)
141
F.9.4 Removing PCI Card (Slot#2 and Slot#3)
143
F.10.2 Installing a TFM Module
145
F.10.3 Connecting FBU Cable
146
F.11 Hdd/Ssd
147
F.11.2 Removing HDD/SSD
148
F.12 Pcie SSD SFF
149
F.12.2 Removing Pcie SSD SFF
150
F.13 Installing LAN Card Module
151
F.13.2 CAN (Fcoe) Card (10Gbps)
153
F.13.3 25G BASE LAN Card
154
F.13.4 40G BASE LAN Card
155
F.14 Installing M.2 Flash Device
156
F.15 Installing Elcm Activation License
157
F.16 FBU for Ext. SAS RAID Card
158
F.16.2 Connecting the FBU Cable to RAID Card
159
F.16.3 Connecting FBU Cable to Connector on IOUB
160
F.16.4 Mounting FBU to OPUB
161
F.17 Installing TPM
163
Appendix G Cable Connection Diagram
164
G.2 Cable Routing
166
Appendix H Prevention of Improper Cable Connections
170
Appendix I Port Number of PCI Card
170
I.2 Fibre Channel Card
171
I.3 SAS Card / SAS RAID Controller Card
172
I.4 CNA Card
173
I.5 Infiniband HCA Card
174
Cisco C880 M5 Configuration Manual (87 pages)
Brand:
Cisco
| Category:
Server
| Size: 1.17 MB
Table of Contents
Table of Contents
3
1 Preface
5
Concept and Target Groups for this Manual
5
Documentation Overview
6
Notational Conventions
7
2 Ipmi
8
Technical Background
8
IPMI over LAN
13
Supported IPMI OEM Commands
14
SCCI-Compliant Power On/Off Commands
15
SCCI-Compliant Signaling Command
19
BIOS-Specific Commands
20
Irmc S5-Specific Commands
22
Data Center Management Interface
30
Serial over LAN (SOL)
30
3 Irmc Configuration
32
Configuration Via the Irmc Web Interface
32
Configuration Via Remote Manager
33
Configuration Via Text Console Redirection
34
Configuration Via Scripting
35
Configuration Via UEFI Setup Utility
36
Configuring the LAN Interface
37
Configuring Text Console Redirection
38
Configuring the Serial over LAN
40
4 Configuration Via Telnet/Ssh (Remote Manager)
42
Requirements on the Managed Server
42
Required User Permissions
43
Logging in
46
Main Menu
48
System Information Menu
49
Power Management Menu
50
Enclosure Information Menu
51
System Eventlog
52
Internal Eventlog
53
Service Processor Menu
54
Console Redirection (EMS/SAC)
55
Shell Menu
55
Console Logging
56
Console Logging Run State Menu
57
5 Configuration Via Scripting
58
Rest
58
Profile Management
61
Profiles
61
Automatic BIOS Parameter Backup
62
Redfish
63
Scci
66
Irmc Configuration Data
66
SCCI File Format
67
Parameters of SCCI Provider-Specific Commands
68
Restrictions
70
Export / Import of Configuration Data
71
Supported SCCI Commands
71
Script Examples
72
Curl Examples
72
Visual Basic (VB) Script
73
Python Script
73
6 Monitoring the Irmc
75
Monitoring with SNMP
75
Irmc System Report
77
Curl Script for Download
77
Visual Basic Script
78
Information Sections
79
Summary Section
80
BIOS Section
81
Processor Section
81
Memory Section
82
Fans Section
83
Temperature Section
83
Power Supplies Section
84
Voltages Section
84
IDPROMS Section
84
Sensordatarecords Section
84
Pcidevices Section
85
Systemeventlog Section
85
Internaleventlog Section
86
Bootstatus Section
86
Managementcontrollers Section
86
Settings Section
87
Adapters Section
87
Interfaces Section
87
Ports Section
87
Snmpagents Section
87
Cisco C880 M5 Installation Manual (87 pages)
Brand:
Cisco
| Category:
Server
| Size: 2.05 MB
Table of Contents
Table of Contents
3
1 Preface
6
Concept and Target Groups for this Manual
6
Notational Conventions
7
2 Functional Overview
8
Features
8
Server Specification
14
3 Installation Steps, Overview
21
4 Important Information
22
Safety Instructions
22
CE Conformity
27
FCC Class a Compliance Statement
27
Transporting the Server
28
Environmental Protection
29
5 Hardware Installation
30
Setup Workflow
31
Advance Preparation Performed by the User
31
Work Performed by the User
31
Work Performed by a Field Engineer
32
Unpacking the Server
33
Rack Installation/Removal of Server
33
Rack System Requirements
33
Connecting Devices to the Server
37
Connecting the Server to the Mains
38
Installation Requirements
38
Input Power Connection Specification
41
Connecting Diagram of the Power Cord
42
Connecting Procedure of the Power Cord
44
Notes on Connecting/Disconnecting Cables
45
Notes on Inserting/Removing Units
45
6 Starting up and Operation
46
Control Elements and Indicators
46
Front of Server
46
Rear of Server
55
Switching the Server on and off
60
Configuring the Server
62
Configuring Fast Boot
62
Configuring Memory Mirror
63
Back up and Restore RAID Configuration Via REST API
66
Configuring the Server and Installing the Operating System
71
Configuring Cougar5(Ep540I)
71
Cleaning the Server
72
Setting of Boot Watchdog before and after Firmware Update of I/O Card
73
Before Firmware Update
73
After Firmware Update
73
Rebuilding Software RAID after Exchanging M.2 SSD
73
Hot-Plug Procedure
74
Replacement Procedure
74
Addition Procedure
75
7 Property and Data Protection
76
Mechanical Access Protection
76
BIOS Setup Security Functions
76
8 Troubleshooting and Tips
77
System Power Indicator Remains Unlit
77
Screen Remains Blank
78
Flickering Stripes on Monitor Screen
78
No Screen Display or Display Drifts
79
Incorrect Date and Time
79
Drives Reported as "Dead" When Starting System
79
Added Drive Reported as Defective
80
9 Appendix
81
Bus Number
81
Correspondence between PHP Slot and Slot Numbers
84
Device Path
84
Replacement of Pcie SSD SFF Slot Number
85
DIMM Installation Order
86
Component Layout
87
Related Products
Cisco C880E7-8800 v2
Cisco C880 E7-8800 v3
Cisco C880 E7-8800 v4
Cisco C800 Series
Cisco CSACS-1121-K9
Cisco UCS C220 M5SX
Cisco CRS-16 AC
Cisco CDE 285-L
Cisco CDE 460 Series
Cisco CDE 460-4R1
Cisco Categories
Switch
IP Phone
Network Router
Wireless Access Point
Conference System
More Cisco Manuals