beautypg.com
Manuals
Brands
Garmin Manuals
Avionics Display
GSU 75 Series
Garmin GSU 75 Series Manuals
Manuals and User Guides for Garmin GSU 75 Series. We have
1
Garmin GSU 75 Series manual available for free PDF download: Installation Manual
Garmin GSU 75 Series Installation Manual (73 pages)
ADAHRS
Brand:
Garmin
| Category:
Avionics Display
| Size: 5.67 MB
Table of Contents
Table of Contents
6
Paragraph Page
7
Section 1 GENERAL DESCRIPTION
11
Section 1 GENERAL DESCRIPTION
11
Introduction
11
Figure 1-1. GSU 75 Unit View (in Rack)
11
Equipment Description
12
Section 1 GENERAL DESCRIPTION
13
Interface Summary
13
Technical Specifications
13
Table 1-1 GSU 75 with 117-00608-00 Rack
13
Table 1-2 Physical Characteristics GMU 44 (011-00870-00, 011-00870-10)
14
Table 1-4 General Specifications
15
Table 1-5 Power Requirements
15
Certification
16
Table 1-7 TSO Authorizations for GSU 75 (011-03094-X0)
16
Table 1-8 TSO Deviations for GSU 75 (011-03094-X0)
17
Operating Instructions
18
Reference Documentation
18
Table 1-10 Referenced Publications
18
Section 2 INSTALLATION OVERVIEW
19
Section 2 INSTALLATION OVERVIEW
19
Introduction
19
Installation Materials
19
Table 2-1 GSU 75 Part Numbers
19
Table 2-2 GMU 44 Part Numbers
19
Table 2-3 GTP 59 Part Numbers
19
Equipment Available
20
Table 2-4 GSU 75 Accessories
20
Table 2-5 GMU 44 Accessories
20
Additional Equipment Required
21
Cabling and Wiring
21
Electrical Bonding
21
Section 2 INSTALLATION OVERVIEW
22
Pneumatic Plumbing
22
Cooling Air
22
GTP 59 Icing
22
Figure 2-1 GSU 75 Air Hose Fitting Locations
22
Installation Approval Considerations for Pressurized Aircraft
23
Mounting Requirements
24
Figure 2-2 GSU 75 with Mounting Rack
25
Table 2-8 Recommended Distance from Magnetic Disturbances
26
Section 3 INSTALLATION PROCEDURE
28
Section 3 INSTALLATION PROCEDURE
28
Unpacking Unit
28
Wiring Harness Installation
28
Table 3-1 GSU 75 Pin Contact Part Numbers
28
Table 3-2 GMU 44 Pin Contact Part Number
28
Table 3-4 GMU 44 Recommended Crimp Tools
29
Table 3-3 GSU 75 Recommended Crimp Tools
29
Backshell Assembly and Installation
30
GSU 75/GMU 44 Interconnect Harness Fabrication Instructions
30
GSU 75/GTP 59 Interconnect Harness Fabrication Instructions
31
Table 3-5 Contents of GTP 59 Installation Kit (011-00978-00 )
31
Table 3-6 Parts Needed for GTP 59 to GSU 75 Installation (See Figure 3-2)
31
Section 3 INSTALLATION PROCEDURE
32
Figure 3-1 Insulation to Pin/Socket Clearance
32
Figure 3-2 GTP 59 Sensor - GSU 75 Interconnect Harness
33
Figure 3-3 GTP 59 Outline and Installation Drawing
34
Pneumatic Connections
35
Figure 3-4 GSU 75 Air Hose Fitting Locations
35
Mounting Instructions
36
Figure 3-5 GSU 75 Mounting
37
Post Installation Configuration and Checkout
38
Continued Airworthiness
38
Section 4 SYSTEM INTERCONNECTS
39
Section 4 SYSTEM INTERCONNECTS
39
Pin Function List
39
Table 4-1 J751 Connector
39
Section 4 SYSTEM INTERCONNECTS
41
Figure 4-2 Pigtail Connector J441
41
Table 4-2 J441 Pin Assignments
41
Power Functions
42
Table 4-3 GSU 75 Aircraft Power
42
Table 4-4 GMU 44 Input Power
42
Table 4-5 GSU 75 Magnetometer Power
42
Data Interfaces
43
Table 4-6 GSU 75 ARINC-429
43
Table 4-7 GSU 75 Configuration Module
44
Table 4-8 GSU 75 RS-232 I/O
44
Table 4-9 GMU 44 RS-232 I/O
44
Table
45
GSU 75 Discrete Inputs
45
Table 4-10 GSU 75 RS-422 I/O
45
Table 4-12 GSU 75 Discrete Inputs
45
GSU 75 OAT (Outside Air Temperature) Probe
46
GSU 75 PPS (Pulse Per Second) Inputs
46
Table 4-13 GSU 75 OAT Probe I/O
46
Table 4-14 GSU 75 PPS Inputs
46
Paragraph
47
GSU 75 ARINC 429 System ID Connections
47
GSU 75 System ID Inputs
47
Table 4-15. GSU 75 ARINC 429 System ID Connections
47
Table 4-16 GSU 75 System ID Inputs
47
Procedure5-1
48
Section 5 POST INSTALLATION, CONFIGURATION, and CHECKOUT
48
Procedure 5-1
48
Section 5 POST INSTALLATION, CONFIGURATION, and CHECKOUT PROCEDURE
48
Function Selector Switches and Display
48
Post-Installation Calibration Procedures
48
Table 5-1 Post-Installation Calibration Procedure Summary
48
Calibration Procedure A-1: Pitch/Roll Offset Compensation by Aircraft Leveling
50
Calibration Procedure A-2: Zero Pitch/Roll Offsets by Manual Entry
51
Procedure5-1
52
Section 5 POST INSTALLATION, CONFIGURATION, and CHECKOUT
52
Calibration Procedure B: Magnetometer Calibration
52
Figure 5-1. Fixed-Wing and Helicopter Position Examples
52
Calibration Procedure C: Heading Offset Compensation
54
Calibration Procedure D: Engine Run-Up Vibration Test
55
Calibration Procedure E: Magnetometer Interference Test
57
Table 5-2 Fixed-Wing Aircraft Magnetometer Interference Test Sequence Example
58
Table 5-3 Helicopter Magnetometer Interference Test Sequence Example
59
Site Evaluation of Magnetic Disturbances for Magnetometer Calibration Procedure
61
Appendix A ASSEMBLY and INSTALLATION DRAWINGS
63
Appendix A ASSEMBLY and INSTALLATION DRAWINGS
63
Figure A-1 GSU 75 Outline Drawing
63
Figure A-2 GSU 75 Installation Drawing
64
Figure A-3 GMU 44 (-00) Mounting Rack
65
Figure A-4 GMU 44 (-10 and -20) Mounting Rack
66
Figure A-5 GMU 44 (-00 and -10) Top Mounted Installation
67
Figure A-6 GMU 44 (-00 and -10) Bottom Mounted Installation
68
Figure A-7 GMU 44 (-20) Top Mounted Installation
69
Figure A-8 GMU 44 (-20) Bottom Mounted Installation
70
Figure A-9 GMU 44 Connector Assembly
71
Figure A-10 GMU 44 Minimum Recommended Installation Clearance
72
Appendix B INTERCONNECT DRAWING
73
Appendix B INTERCONNECT DRAWING
73
Figure B-1 GSU 75 Example Interconnect
73
Related Products
Garmin GSU 25
Garmin GSU 75
Garmin GSU 75H
Garmin GSU 75B
Garmin G600
Garmin GNC 420A
Garmin GTN 7XX
Garmin GPS 400, GNC 420
Garmin GAP 26
Garmin GFC 600
Garmin Categories
GPS
Watch
Car Navigation system
Avionics Display
Marine GPS System
More Garmin Manuals