beautypg.com
Manuals
Brands
ICP Manuals
Furnace
9MPD080J16C1
ICP 9MPD080J16C1 Manuals
Manuals and User Guides for ICP 9MPD080J16C1. We have
1
ICP 9MPD080J16C1 manual available for free PDF download: Installation Instructions Manual
Icp 9MPD080J16C1 Installation Instructions Manual (63 pages)
90+ Single Stage Category IV Furnance, FAN ASSISTED, DIRECTOR NON-DIRECT VENT GAS FURNACE
Brand:
Icp
| Category:
Furnace
| Size: 5.02 MB
Table of Contents
Safety Requirements
1
Table of Contents
1
Start-Up Check Sheet
2
Safe Installation Requirements
3
Safety Rules
3
Installation
4
Location and Clearances
4
Frozen Water Pipe Hazard
4
Winter Shutdown
4
Typical Downflow Installation
5
Installation Requirements
5
Knock Outs
7
Vent and Combustion Air Connections
7
Horizontal Furnace Installation
7
Installation Positions
7
Combustion & Ventilation Air
8
For Single Pipe Installation
8
Outdoor Combustion Air Method
8
Air Openings and Connecting Ducts
8
Indoor Combustion Air
9
Standard and Known-Air-Infiltration Rate
9
Ventilation Air
10
Venting and Combustion Air Check
10
Vent and Combustion Air Piping
11
For Two Pipe Installation
11
Single Pipe
11
Direct Vent
11
Contaminated Combustion Air
12
Vent and Combustion Air Piping Guidelines
12
Combustion Air and Vent Piping Insulation Guidelines
13
Sizing Combustion Air and Vent Pipe
13
Vent Termination Clearances
13
Direct Vent Termination Clearance
14
Other than Direct Vent Termination Clearance
15
Condensate Drain Trap
16
Condensate Drain Trap Freeze Protection
16
Upflow Installations Top Vent
17
Upflow Installations Vent Thru Left Side
18
All Models Vent Thru Right Side
19
Downflow Left Side Vent and Trap
20
Downflow Right Side Vent and Trap
21
Horizontal Left Thru Top
22
Horizontal Left-Side Vent
23
Horizontal Right Thru Top
24
Horizontal Right-Side Vent
25
Connecting Vent and Combustion Air Piping
26
Combustion Air Pipe Connection
26
Vent Pipe Connection
26
Connecting Vent Pipes and Termination
27
Joining Pipe and Fittings
27
Horizontal Termination
28
Vertical Termination
28
Using Exterior Risers
28
Vent Termination Shielding
28
Concentric Termination
30
Gas Supply and Piping
32
Gas Piping Requirements
32
Typical Gas Piping for Upflow
33
Typical Gas Piping for Downflow
33
Additional LP Connection Requirements
34
LP Conversion
34
Gas Supply Pressure
34
Manifold Gas Pressure Adjustment
34
Manifold Pressure and Orifice Size for High Altitude Applications
35
Natural Gas Manifold Pressure
36
General Derating Rules
36
High Altitude Air Pressure Switch
36
Electrical Wiring
37
Changing Orifices for High Altitude
37
Final Check
37
Power Supply Wiring
37
J-Box Relocation
38
Furnace Control
38
Thermostat
38
Optional Equipment
38
Ductwork and Filter
39
Connections
39
Sizing
39
Insulation
39
Filter Installation Using Optional Filter Rack
40
Addition of Air Conditioning
40
Downflow Furnace Installation
40
Bottom Mounted Filter Rack
40
Subbase for Combustible Floor
41
Furnace Subbase
41
Checks and Adjustments
42
Setting the Subbase
42
Condensate Line Raised by Base
42
Main Burner Flame Check
42
Temperature Rise Check
43
Changing Blower Speed
43
Ignitor Location
43
Blower Speed Chart
43
Furnace Maintenance
44
Sequence of Operation & Diagnostics
45
Cooling Request
45
Heating Request
45
Heating Request with Gas Shut off
46
Control Board Diagnostic Codes
46
Control Board
46
Model Specifications
48
Circulation Air Blower Data
51
Wiring Diagram
53
Related Products
ICP 9MPD080J16B1
ICP *9MPD080J16A
ICP 9MPD080J16C2
ICP 9MPD080J16B
ICP 9MPD075F12B1
ICP *9MPD050F12A
ICP *9MPD075F12A
ICP 9MPD050F12C2
ICP 9MPD050F12B
ICP 9MPD075F12B
ICP Categories
Furnace
Air Conditioner
Heat Pump
Computer Hardware
Motherboard
More ICP Manuals